|
|
|
|
|
1912 The entire interior of the church was renovated. A porch was added in front of the main door, the stairways leading to the sanctuary and the balconies were rebuilt, the style of architecture in the sanctuary was changed from Romanesque to English Gothic, side balconies were removed and a new ceiling, as well as new chancel fittings were installed. The altar, reredos, pulpit, lectern, baptismal font, and communion rail were all new and carved from Caen Stone, imported from Normandy. |
|
1929 The new Memorial Sunday School Building was erected, costing $125,000. The dimensions of this addition were 100 feet by 90 feet. The new addition was called the Memorial Sunday School Building in memory of those persons whose bodies were buried in the path of the new addition and whose remains were reinterred beneath the Main Sunday School room. A new fully equipped and modern kitchen was added to the west side, and storage rooms, a locker room, shower/bath, and other accessories were added adjacent to the new recreation room in the basement. |
|
|
|
|
1988 The interior of the Nave was renovated and the organ was rebuilt by Schantz Organ Company. Dedication of the renovated Nave and organ took place in 1989. |
|
|
|
|
History taken from the church directory |
|||
| [Welcome] [Worship Schedule] [Meet The Team] [About Us] [Newsletter] [Prayer Requests] [Ministries] [Our History] [Find Us] [Links] |